Projects
> 2022-IRON DESTINY

A satisfied client will always revert to his service provider!


That was the case of M/V IRON DESTINY which returned to our Shipyard to perform an extensive volume of works, as per below:

 

Normal docking works

Treatment and painting

External Hull / Superstructure & Funnel

 

Steel works

  • Structural steel: up to 200 t in water ballast tank and cargo holds;
  • Soft steel: up to 2,500 kg;
  • Hatch coaming: up to 5,000 kg.

Pipe works: up to 130 rm;

Mechanical works: Main engine o/h, pumps o/h, electric motors and fans o/h;

Miscellaneous: Renewal O/S wire of crane (2 nos) & load test for crane (6 nos);

Staging: up to 5,000 cbm.


 

General

Type Bulk Carrier
Status finished
LOA 246.99
B 42.02
DWT 89,846
News & Press
> News and events
Between 11 and 13 June in Bucharest is taking place the General Assembly of SEA Europe (Shipyards' ...
16.06.2025
The 171st edition of the Informal Tanker Operators' Safety Forum (ITOSF) took place on June ...
12.06.2025
Between May 20–23, 2025, Constanța Shipyard (Șantierul Naval Constanța S.A.) ...
26.05.2025