That was the case of M/V IRON DESTINY which returned to our Shipyard to perform an extensive volume of works, as per below:

 

Normal docking works

Treatment and painting

External Hull / Superstructure & Funnel

 

Steel works

  • Structural steel: up to 200 t in water ballast tank and cargo holds;
  • Soft steel: up to 2,500 kg;
  • Hatch coaming: up to 5,000 kg.

Pipe works: up to 130 rm;

Mechanical works: Main engine o/h, pumps o/h, electric motors and fans o/h;

Miscellaneous: Renewal O/S wire of crane (2 nos) & load test for crane (6 nos);

Staging: up to 5,000 cbm.


 

General

Type Bulk Carrier
Status finished
LOA 246.99
B 42.02
DWT 89,846
Customer center
> News and events
Following the conclusion of Posidonia 2024 at the Athens Metropolitan Expo, 3rd -7th of June 2024 ...
10.06.2024
The need in reduction of ship’s fuel consumption and fulfilling the new environmental rules ...
30.04.2024
On 9th of February 2024 Prime Minister Marcel Ciolacu, the Minister of Labor and Social Solidarity ...
09.02.2024