Projects
> 2019-MT "Ionic Anasa", MT "Ionic Althea"

The ships are sister vessels and arrived in Constanta Shipyard at end July (Ionic Anasa) and begining of November (Ionic Althea), the main works being scrubber installation, including: Soft steel: 3.8 t Structural steel: 56.4 t (scrubber casing); Exhaust line rolled pipe 1.95 tons (Dia 1700 mm and Dia 1350 mm) and seamless pipe up to 21 rm ; GRE pipe - 129 rm
for main repair works being mentioned below:

-     Normal docking works: anodes renewal, valves o/h, anchor chains ranging/cleaning, tail shaft wear down measuring, rudder clearances measuring; propeller remove/refit
-     External hull treatment: grit blasting SA1/SA2 up to 1,850sqm
-     Pipe works: up to 50 rm in total;
-     Steel works:
o    Structural steel:  30t Soft steel: 1 t;
o    Panama chocks modifications with underdeck reinforcement 7 tons;   
-    Mechanical and electrical works:
o    Main Engine: piston o/h (3 nos), bearings inspection, fuel injection pumps; turbocharger, air cooler;
o    Diesel Generator: alternator (3 nos), turbochargers o/h (3 nos);  
o    Lifting appliance testing

General

Type Crude Oil Tanker
Status finished
LOA 249.97 m
B 44.00 m
DWT 114,718
Customer center
> News and events
On 9th of February 2024 Prime Minister Marcel Ciolacu, the Minister of Labor and Social Solidarity ...
09.02.2024
Organized in the world port city of Rotterdam, Europort is the international maritime meeting place ...
24.11.2023
Santierul Naval Constanta SA (Constanta Shipyard), is continuing its steady course as a leading NB ...
11.09.2023