Projects
> MV “ANGEL SEHAM” - 2011 (ex Lady Seham)

The ship arrived in Constanta Shipyard at the end of October / beginning November, main repair works being mentioned below:


  • External hull treatment, total area of 5,963 sqm of HPFW washing, SA1 & SA2 grit blasting, air blowing, T/U & F/C multiple coats painting;
  • Cargo hulls treatment: approx. 10,520 sqm of HPFW washing and multiple coats painting;
  • Regular dry dock works: sea valves, anchor / chains, sea chest, tail shaft withdrawal and rudder clearances mesurements;
  • Steel works: top side tanks, approx. 10 tons; hatch coamings: 1,5 tons and rubber packing channel of 28 rm.


General

Type Bulk carrier
Status finished
LOA 159.76
B 25.21
DWT 25,403
Customer center
> News and events
On 19th of November 2016 Constanta Shipyard has launched the ship NB 606 – an oil / chemical ...
19.11.2016
At Posidonia Exposition 2016, which took place in Athens during 06-10 June 2016, our ...
13.06.2016
On 16th of April 2016 Constanta Shipyard has launched the ship NB 608 – a PSV 5000 MAXICASCO ...
16.04.2016