> 2005-MT "VEMAOIL"

The motor tanker was converted from single to double hull, conversion made my extension of the vessel's beam.

Besides the fabricated and fitted steel quantity of more than 190 tons and the related piping system, the subject vessel's conversion working drawings and the new docking plan were designed by our team.

General

Type Products Tanker
Status finished
LOA 81.320 m
B 13 m
DWT 2,958