Projects
> 2007-MT "AMADEO"

MT “AMADEO” (ex “REA”) came to Constanta Shipyard on November 2006 for conversion works from single hull to double hull / double bottom, in accordance with the new MARPOL regulations for oil tankers, by adding a longitudinal bulkhead, top plating and their associated structure.
The vessel was re-delivered to the Owners in July 2007, upon completion of conversion and repairs works, which finally ended up to the following quantities:
- conversion steel : about 1,300 tons;
- steel renewals : about 197 Tons;
- blasting and painting : about 43,000 sqm;
- pipe works : about 6,000 r.m. ;
- extensive mechanical works, including repairs and up-grading of existing equipments and machinery.
Being a conversion project, upon completion of works, as a request of Class an Inclining Test has been performed, the results being to the satisfaction of Owner and Class.

General

Type Products Tanker
Status finished
LOA 190 m
B 28 m
DWT 39,350
News & Press
> News and events
Rotterdam, 4–7 November 2025 — Europort, hosted in the world port city of Rotterdam ...
10.11.2025
Between July 24–25, Constanța Shipyard hosted the 99th meeting of the members of the The ...
28.07.2025
For those involved in shipping (sailors, ship-builders, ship repairers) it is a well-known fact ...
26.06.2025