> 2008-MV "CARMEN SILVA"

The bulker under Malta flag came to Constanta Shipyard in December 2007, for various repair works that required 3 docking periods (86 days): tail shaft removal, rudder dismantling & refitting works, over 33,000 sqm of blasting works and approx. 93,000 sqm of painting works (hull, deck, ballast tanks, cargo holds and hatch covers), 650 m of piping works, the total quantity of steel renewal being over 350 t.

In addition, we have performed several mechanical and electrical works: pumps and their electric motors, radar equipment and mounting of equipment provided by the owner.

General

Type Bulk Carrier
Status finished
LOA 171,48 m
B 24,8 m
DWT 25,739
News & Press
> News and events
Every POSIDONIA event offers a unique opportunity to strengthen professional relationships while ...
09.06.2026
For five days, from 1–5 June 2026, the global shipbuilding and ship repair community gathered ...
08.06.2026
Rotterdam, 4–7 November 2025 — Europort, hosted in the world port city of Rotterdam ...
10.11.2025