M/T VALFOGLIA, crude oil tanker of 110,000 dwt under Italian flag, came to Constanta Shipyard for normal dry dock works (rudder measurements and renewing zinc anodes), sandblasting and painting works (exterior hull and ballast tanks), steel renewal works (damaged area located in fore part, no.1 Water Ballast Tank and Forepeak – approx. 150 tones), pipe renewal and mechanical works. The repairs works have been completed according to the contractual terms, to the full satisfaction of the Client.

General

Type Crude Oil Tanker
Status finished
LOA 243 m
B 42 m
DWT 108,628