Projects
> 2003- MV NURIA TAPIAS

The Suezmax tanker of 130,000 dwt, with GRT of 83,724 mt and LOA of 274 meters was seriously damaged in a collision.

The total quantity of steel used for the renewal of the bulbous bow was of more than 200 tons, which was fabricated and installed as one block.

 

 

 

General

Type Suezmax Tanker
Status finished
LOA 274
DWT 130,000
News & Press
> News and events
Between 11 and 13 June in Bucharest is taking place the General Assembly of SEA Europe (Shipyards' ...
16.06.2025
The 171st edition of the Informal Tanker Operators' Safety Forum (ITOSF) took place on June ...
12.06.2025
Between May 20–23, 2025, Constanța Shipyard (Șantierul Naval Constanța S.A.) ...
26.05.2025