Projects
> 2019-MT "VALLESINA"

The ship arrived in mid April 2019 in Constanta Shipyard, in order to perform several repair works and specific docking works.  The main works being the following:

 

•    Regular dry dock works: anchor chains cleaning, sea chest cleaning, sea valves overhauling, rudder clearances measurements, tailshaft wear down, anodes renewal;
•    External hull treatment: total area 17.000 sqm (HPFW washing, grit blasting SA1 + SA2, silicone paint application underwater area and bootop); Propeller silicone paint application
•    Retrofit installation of water Ballast Treatment System – Headway
•    Various electrical and mechanical works: ME overhauling (7 lines), pumps overhauling (16 pcs.); electric motors overhauling; load test of lifeboats and davits;


Finally, the ship left the Shipyard, upon completion of repairs according to the contractual terms, to the full satisfaction of her Owners.

General

Type Crude Oil Tanker
Status finished
LOA 243 m
B 42.02 m
DWT 109,060
Customer center
> News and events
Between May 20–23, 2025, Constanța Shipyard (Șantierul Naval Constanța S.A.) ...
26.05.2025
For two days (24th and 25th of April 2025), services & ship-repairs worldwide companies met in the ...
28.04.2025
On 12th of November 2024, after completion of her commercial obligations and having finalized the ...
22.11.2024