Projects
> 2018-MV "OCEAN BROTHER"

MV OCEAN BROTHER, arrived in August 2018 in Constanta Shipyard, in order to perform several repair works and specific docking works.  The main works being the following:

  • Regular dry dock works: anchor chains cleaning, sea chest cleaning, sea valves overhauling, rudder clearances measurements, tailshaft wear down, anodes renewal;
  • External hull treatment : total area 8 895 sqm ( HPFW washing, gritblasting SA1 + SA2, T/U and F/C multiple coats painting);
  • Hatch cover treatment : total area 2 740 sqm ( HPFW washing, gritblasting SA1 + SA2, T/U and F/C multiple coats painting);
  • Cargo Hold treatment : total area 11 654 sqm ( HPFW washing, gritblasting SA1 + SA2, T/U and F/C multiple coats painting);
  • Steel works : up to 200 t ( located in cargo holds, hatch coaming, cross deck)
  • Various electrical and mechanical works: bearings overhauling, winch overhauling; electric motors overhauling; load test of lifeboats and davits;

Finally, the ship left the Shipyard, upon completion of repairs according to the contractual terms, to the full satisfaction of her Owners.

 

General

Type Bulk carrier
Status finished
LOA 169.26
B 27.23
DWT 28 463
News & Press
> News and events
Rotterdam, 4–7 November 2025 — Europort, hosted in the world port city of Rotterdam ...
10.11.2025
Between July 24–25, Constanța Shipyard hosted the 99th meeting of the members of the The ...
28.07.2025
For those involved in shipping (sailors, ship-builders, ship repairers) it is a well-known fact ...
26.06.2025