Projects
> 2015-MT "BARBARICA"

At the Owners' decision (MEDITERRANEA DI NAVIGAZIONE, Italy),  the tanker "BARBARICA" underwent  an extensive volume of works for increasing the ship's efficiency: renewal of bulbous bow (abt. 195 tons), modification of aft part (the so called "duck tail" assembly) in order to improve the water flow, installing the rudder bulbs. Apart of these atypical jobs, several mechanical works were performed and also the Shipyard's first time application of MARINE LINE in cargo tanks (repairs works).

General

Type Oil Tanker
Status finished
LOA 143
B 23
DWT 18,700
News & Press
> News and events
For those involved in shipping (sailors, ship-builders, ship repairers) it is a well-known fact ...
26.06.2025
Between 11 and 13 June in Bucharest is taking place the General Assembly of SEA Europe (Shipyards' ...
16.06.2025
The 171st edition of the Informal Tanker Operators' Safety Forum (ITOSF) took place on June ...
12.06.2025