> 2011-MT CE-MERAPI

During June and July we have performed dry dock repairs to M/T “CE-MERAPI”, main works being mentioned below:

- Normal docking works: anchors and chains, valves overhauling, anodes and sea chests renewal, tail shaft and rudder measurements, tail shaft sealing system overhauling

- Hull treatment: High Pressure Fresh Water Jet washing: 18,624 m², grit blasting e SA1/SA2 ~2000 m² from external hull surface, painting and treatment in 4 ballast tanks, starboard and portside;

- Steel and soft steel works: renewal of approx. 4.5 tons of steel, in ballast tanks and external hull, including soft steel works in various locations;

- Piping works: minor repairs to ballast installation, fire fighting and compressed air systems, Engine Room and main deck;

- Mechanical and Electrical works: boiler valves, pumps overhauling (one cargo pump and two ballast pumps), Main Engine scavenging cooler, PV valves overhauling, life saving installation repairs, fans and electrical engines overhauling.

 

General

Type Crude / Oil Products Tanker
Status finished
LOA 240.99
B 42
DWT 105,274
News & Press
> News and events
Rotterdam, 4–7 November 2025 — Europort, hosted in the world port city of Rotterdam ...
10.11.2025
Between July 24–25, Constanța Shipyard hosted the 99th meeting of the members of the The ...
28.07.2025
For those involved in shipping (sailors, ship-builders, ship repairers) it is a well-known fact ...
26.06.2025